Organization of works related to the ventilation and air‑conditioning systems
A cost estimate of a ventilation system with a heat recovery
1. Film in the standard version.
2. Film with subtitles.
3. Film with pauses. Listen and repeat.
4. Film with narration.
After listening to the above dialogue mark the correct answer. Po wysłuchaniu powyższego dialogu zaznacz prawidłową odpowiedź.
Prawda | Fałsz | |
A bidding cost estimate has been made. | □ | □ |
An investor’s cost estimate considers a simplified calculation. | □ | □ |
The design foresees ventilation pipes from steel. | □ | □ |
If you a replacement cost estimate is chosen, they will have to sign an addendum to a contract. | □ | □ |
Ventilation pipes will be made from polyethylene pipes. | □ | □ |
Ventilation system with a heat recovery. | □ | □ |
As - built bill invoices is based on a bill of quantities. | □ | □ |
A replacement cost estimate is necessary. | □ | □ |
Match English terms with their Polish equivalents.Połącz angielskimi terminy z ich polskie odpowiednikami.
katalog norm, dziennik budowy, obmiar robót, przedmiar robót, aneks do umowy, kosztorys inwestorski, rekuperacja, kosztorys ofertowy
investor’s cost estimate | |
bidding cost estimate | |
bill of quantities | |
quantity survey | |
construction log | |
standard catalogue | |
heat recovery | |
addendum to a contract |
Elements of a cost estimation of a ventilation system
After listening to the dialogue choose the correct answer. Po wysłuchaniu powyższego dialogu zaznacz prawidłową odpowiedź.
Prawda | Fałsz | |
We don’t need baseline data for a cost estimate. | □ | □ |
The indirect costs and the profit need to be consulted by the parties. | □ | □ |
The cost estimate doesn’t include the value of equipment use costs. | □ | □ |
We don’t draw up the execution of works contract. | □ | □ |
After preparing the cost estimate you read a project documentation. | □ | □ |
We need a bill of quantities for a cost estimate. | □ | □ |
The cost estimate doesn’t include labor costs. | □ | □ |
We need to determine the right catalogue of standard prices and rates and standards. | □ | □ |
Control‑testing equipment
After watching the film and listening to the speaker’s comments choose the correct answer. Po obejrzeniu filmów i wysłuchaniu komentarza lektora zaznacz prawidłową odpowiedź.
Prawda | Fałsz | |
A u-tube liquid column manometer measures pressure differences. | □ | □ |
A hygrometer measures pressure. | □ | □ |
A Prandtl pipe measures the speed of the liquid flow with the use of pressure measurement. | □ | □ |
A psychrometer measures the speed of the flow. | □ | □ |
A u-tube liquid column manometer measures the differences of temperatures. | □ | □ |
A pressure anemometer for measuring uses the pressure differences in a flowing liquid on the basis of Pitot tube. | □ | □ |
A Prandtl tube measures temperaturę. | □ | □ |
A psychrometer displays the humidity of the air as the difference of temperatures between a dry thermometer and a wet one. | □ | □ |
Measuring devices
Tasks
Match the beginnings of the sentences with the endings.Połącz początki zdań z pasującymi końcami.
<span lang="en">or we might buy a pressure anemometer. </span>, <span lang="en">nor can he read the hygrometer. </span>, <span lang="en">yet he doesn’t want to become a builder. </span>, <span lang="en">so is his workmate. </span>, <span lang="en">but he hasn’t made any profit yet. </span>, <span lang="en">or I will only show you the plan design. </span>, <span lang="en">since I have studied the manual very carefully. </span>, <span lang="en">and went to a construction site. </span>
The builder took his toolbox, | |
The businessman opened the warehouse, | |
I will do my job straightaway, | |
He is very good at fixing broken things, | |
I think I will repair this ventilation system myself, | |
Kevin can’t read the pressure anemometer, | |
Tom is a very good at calculating the direct costs, | |
We might install a psychrometer, |
Dictionary
/æz bɪlt bɪl ˈɪnvɔɪsɪs/ [noun, countable] kosztorys powykonawczy
/ˈbeɪs.laɪn ˈdeɪ.tə/ [noun, uncountable] dane wyjściowe
/bɪl ɒv kwɒntətis/ [noun, countable] przedmiar robót
/baɪˌmɛtəl thetaəˈmɒm.ɪ.tər/ [noun, countable] termometr bimetalowy
/əv ˈstæn.dəd praɪsiz ənd reɪts/ [noun, countable] katalog nakładów rzeczowych
/kɒst ˌes.tɪˈmeɪ.ʃən/ [noun, countableor uncountable] kosztorysowanie
/dɪˈrekt kɒsts/ [noun, uncountable, plural] koszty bezpośrednie
/ɪk thetaəˈmɒm.ɪ.tər wɪð ə kəˈpɪl.ər.i/ [noun, countable] termometr elektroniczny z kapilarą
/hiːt rɪˈkʌv.ər.i ˌven.tɪˈleɪ.ʃən/ [noun, uncountable] rekuperacja
/haɪˈɡrɒm.ɪ.tər flu:/ [noun, countable] higrometr
/ˌɪndɪˈrekt kɒst/ [noun, uncountable, plural] koszty pośrednie
/ˈlɪk.wɪd ˈthetaɜː.məl ɪkˈspæn.ʃən/ [noun, countable or uncountable] rozszerzalność cieczy
/ˈmet.əl ˈthetaɜː.məl ɪkˈspæn.ʃən/ [noun, countable or uncountable] rozszerzalność termiczna metali
/ˈɔːdə(r) ɒv ˈmæɡnɪtjuːd ˈestɪməts/ [noun, countable] kalkulacja uproszczoną
/ˌpɒl.iˈetheta.əl.iːn paɪp/ [noun, countable] rura polietylenowa
/ˈpreʃ.ər ˌæn.ɪˈmɒm.ɪ.tər/ [noun, countable] anemometr ciśnieniowy
/ˈprəʊ.tə.kɒl əv ˈbeɪs.laɪn ˈdeɪ.tə/ [noun, uncountable] protokół danych wyjściowych
/ˌsaɪ.krəʊm.ɪ.tər/ [noun, countable] psychrometr
/ˈkwɒntətiti ˈsɜːveɪ/ [noun, countable] obmiar robót
/rɪˈpleɪsmənt kɒst ˈestɪmət/ [noun, countable] kosztorys zamienny
/raɪt kɒst ˈes.tɪ.mət/ [noun, countable] kosztorys właściwy
/ˈstæn.dəd/ [noun, countable] normatywy
/trænzˈmɪt.ər/ [noun, countable] przetwornik
/tjuːb ˈlɪk.wɪd ˈkɒl.əm mænˈɒm.ɪ.tər/ [noun, countable] manometr cieczowy u – rurka
/veɪn ˌæn.ɪˈmɒm.ɪ.tər/ [noun, countable] anemometr skrzydełkowy
/ˌven.tɪˈleɪ.ʃən ˈsɪs.təm/ [noun, countable] instalacja wentylacyjna